Alert
  • Published: 26 May 2011
  • Incident ID: 3176

Fatality - High Pressure Air Release

Cause & Consequence

  • Failure of vessels or pipework
Incident Consequence
Fatality

Incident Location

Drilling unit

Incident Activity

Maintenance

Incident Info Source

SCIS

Specific Incident Equipment

No details available.

Lessons Identified

The crew did not have full knowledge of the valve assembly and the necessity for completing venting pressure on pressurised lines.A false sense of security was created by the lack of pressure on the downstream vent valve on the number 3 tensionerPressure was left on the line in the event a quick change was needed to put the number 7 tensioner which was paired with the number three tensioer into serviceThe job was planned to be broken down into 3 phases. At the completion of each phase the job was to be stopped and the next phase was to be planned before going forward. The three phases did not occur.The crew were into phase 2 when the incident ocurred and there was no stoppage of work or phase planning between phase 1 and 2.

Incident Recommendations

Not advised