Cause & Consequence
- Uncontrolled release of a flammable gas or liquid
Incident Location
FPSO
Incident Activity
Production operations
Specific Incident Equipment
1/2" fitting on turbine
Lessons Identified
- The fitting was found to be undertight, however the cause could not be determined
- The equipment was thoroughly checked and no further issues were identified on this or the other turbines
- All gas heads were checked to ensure the correct calibration settings
Incident Recommendations
- Review outcome from checks made to small bore tubing equipment on this and other turbines
- Check all technician competency records to identify any shortcomings on small bore tubing and to ensure ongoing competency checks are in place
- Modify gas head indication to provide early alarm on F & G panel
Rate this alert
Average Rating
Latest Alerts & Moments
Our searchable catalogue of hundreds of Safety Alerts and Safety Moments are all designed as learning resources that can help improve workplace safety.