Cause & Consequence
- Uncontrolled release of a flammable gas or liquid
Incident Location
Fixed Installation
Incident Activity
Production operations
Specific Incident Equipment
Pig Launcher
Lessons Identified
- The quality of the door seal installation may not have been as per procedure
- There was no requirement documented for further leak test requirements if there was a prolonged waiting period after the initial test
Incident Recommendations
- Ensure specified trade discipline change the door seal as per procedure ‘Operation and Maintenance of Band Lock Seals’
- Upgrade Pig Launcher door seal to ensure fit for service
- Review Pig Launcher door design philosophy
- Update procedure to clearly define leak test requirements (retest after prolonged period)
Rate this alert
Average Rating
Latest Alerts & Moments
Our searchable catalogue of hundreds of Safety Alerts and Safety Moments are all designed as learning resources that can help improve workplace safety.