Cause & Consequence
- Uncontrolled release of a flammable gas or liquid
Incident Location
Fixed Installation
Incident Activity
Production operations
Specific Incident Equipment
LP degasser overboard dump vent line
Lessons Identified
- LP degasser vessel had been taken out of service and in 2009 the inlet to the vessel was isolated but never fully valve or positively isolated.
- In 2009 the decision was made to permanently not use the LP degasser - the required decommissioning process was however not instigated.
- There is no recorded historical evidence of maintenance of the associated lute seal on the vent line.
Incident Recommendations
- Apply positive isolation scheme to the degasser
- Ensure lute seal on the liquid outlet is maintained
- Communicate to all sites to instigate cross check that operationally critical equipment being rendered redundant has been decommissioned according to current policy.